Building regs and party wall
Do I need building regs or a party wall award?
Permitted development is not the same as no approval needed. Most extensions and lofts also need Building Regulations approval, and often a Party Wall Act award. See what your project needs across all three before you commit to anything.
You are not on your own
How GG Architecture takes it from here
A free tool is a starting point. GG Architecture is an architectural design practice that handles the whole thing, from the first idea to the finished build, arranging chartered sign-off for any stage that needs it, so you have one expert point of contact the entire way.
01
Clarity Call
Free, 30 minutes
We pressure-test your idea, confirm the planning route, and tell you honestly whether it works before you spend a penny.
02
Site visit
RIBA Stages 0 to 1
We come to the property and see the site for ourselves, so the drawings start from what is really there.
03
Planning drawings
RIBA Stage 3
We design the scheme and produce the planning drawing set for your application.
04
Building control drawings
RIBA Stage 4
Building regulations drawings and construction details your builder and building control work from.
